Language
한국어English

Build a group work split

Work & EmailStudy

Give the topic, team size and deadline, and get a task table with owner slots left blank.

Fill the blanks and it copies as you filled it

Make a table splitting up our group project.

- Topic: 
- Team size: 
- Deadline: 
- Tasks, if they're already set: 
- A table of task / owner / due date. Leave owners blank as "Member 1" and so on
0 of 4 blanks filled · anything left blank copies with its brackets

What this prompt does

Compared with asking the same thing without the length and format lines.estimate

Estimated output tokens
700
Asked loosely
700
This prompt
Energy (Wh)
1.215
Asked loosely
1.215
This prompt

Token counts are estimated from character counts, not measured. Energy uses the per-band figures measured by Jegham et al. 2025 as published.

A shorter answer, but the same energy band. The measurements are per band, and this much does not cross one.

Reported backfire — Specifying output formatA 78% increase in one GPT-4o scenario. The paper classifies this one as apply-selectively
Where these figures come from

We read the prompt to see whether it carries that instruction. The percentages below are published figures for the rule itself, not a measurement of what this prompt saves.

Assigning a role
44%mean reduction · 95% CI 2959%
Podder et al. 2026 BP#4 · 19 use cases / 61 prompts
by modelGPT-4o 34%Command R+ 50%Mistral-7B 49%
Specifying output format
49%mean reduction · 95% CI 3761%
Podder et al. 2026 BP#6 · 14 use cases / 45 prompts
by modelGPT-4o 40%Command R+ 50%Mistral-7B 57%

Often used alongside

See all 76